LA403 Urban Planning Studio; L.A. River Master Plan

Master Plan. (AutoCAD, Photoshop, Illustrator)

Perspective of Pump Installation and Wetlands. (Revit, Photoshop)

Perspective of Re-purposed Warehouse Park. (Revit, Photoshop)

Perspective 2 (Revit, Photoshop)

Section of Pump Station and river access point. (Photoshop, Illustrator)

Phasing of connecting green space and appropriating warehouses. (AutoCAD, Illustrator, Photoshop)

Preliminary diagram of redirecting the L.A. River through downtown Los Angeles with the use of inflatable dams and Archimedes screw pumps. (Photoshop, Illustrator)